2026-06-206 min read
25 PRs, a rescued BoE fetcher, and a composer taught restraint: the editorial pipeline ships
PR #53 merged on 12 June: the first article through the full X.8 grounded editorial pipeline. The morning sweep showed three gaps that had been quietly open — a stale PR that would have deleted the BoE rates fetcher, a composer inferring beyond its sources, and a design sprint that completed the day after. All three closed within 72 hours.
Read post→