Build LogNavigation
#11
2026-07-175 min read

Seven navigation phases. The prerequisite chips encoded the one thing the others couldn't.

The learning navigation spec ran seven phases from foundational structure to site-wide search. P5 — prerequisite chips, a static 'Read first' link at each chapter head — was the smallest implementation. It was also the highest return: every other phase encoded page structure, and P5 encoded reader intent.

Read post→
Build LogLearning Hub
#12
2026-07-165 min read

The navigation plan shipped on Pagefind. Prerequisite chips were the higher-leverage fix.

Six phases of navigation work shipped on the learning hub in July. Pagefind — site-wide search — closed the programme. Prerequisite chips, one phase earlier, delivered more navigability per line of code by firing at orientation time rather than recovery time.

Read post→
Build LogLearning Hub
#13
2026-07-156 min read

The navigation spec pre-ranked prerequisite chips over search. Six phases later, that held.

The conventions.md backlog called prerequisite chips at the chapter head the single highest-value navigability fix before any code shipped. Pagefind search and an IntersectionObserver right-rail TOC both landed in the same programme. The ranking held. This is why.

Read post→
bb financeiOS
#14
2026-06-245 min read

I had the Accounts calendar scoped as one level. Mid-design I deepened it to three.

Phase K shipped a horizontally-scrollable daily-activity strip on the Accounts screen. Phase O was meant to replace it with a calendar — I had a compact, single-level surface already scoped. Mid-design I deepened the ask to full-screen plus day mode, and a back-nav regression in round-2 device QA explains why that was the right call.

Read post→
Build LogiOS
#15
2026-06-246 min read

The Accounts screen took four iterations. Each one bought fidelity by spending scope.

Sprint 2 shipped a SwiftUI list with CRUD. Phase K rebuilt it into a module stack with a trend chart and activity strip. Phase O turned the strip into a three-level calendar flow. Round-2 device QA on AnF found the back-nav bug that came with it.

Read post→