Build LogUK Calculators
#91
2026-07-255 min read

10 of 13 sentences made it. The verifier caught the rest before they reached a pillar page.

The June 30th cron produced a mortgage rate-spike draft grounded in April 2026 data. Ten of thirteen sentences passed. The three that didn't never reached a pillar page — and the next two days showed why that distinction matters at publishing scale.

Read post
Build LogContent Pipeline
#92
2026-07-256 min read

14 days of daily publishing: the three failure modes I hadn't designed for

A 14-day publish cadence on UK Calculators surfaced three failure modes: title-mangling produces permanent ugly slugs, zero-draft mornings expose the absence of a fallback queue, and triage without memory republishes the same cluster it shipped the day before.

Read post
Build LogSEO
#93
2026-07-255 min read

AdSense low-value rejection: thin pages, empty hubs, and six SVG diagrams

UK Calculators was rejected for low-value content on 10 July — ads.txt was authorised, so this was purely a content-quality judgement. Three concrete moves addressed the specific inventory-value criteria: expanding thin calculator landings, adding SVG diagrams across the pillar estate, and populating empty hub pages the rejection identified.

Read post
Build LogUK Calculators
#94
2026-07-255 min read

The E2E suite billed 1,130 minutes to test a page that never existed

A Playwright suite on a private repo ran 69 times in three weeks, failed 61 of them, and billed roughly a thousand minutes doing it. The root cause was three mistakes stacked on top of each other, and the deepest one was mine: I did not know GitHub Actions had a bill.

Read post
Build LogLearning
#95
2026-07-245 min read

The backlog called it a content gap. It was navigation.

Completing an eight-chapter course on the learning hub felt like progress. Then I looked at what had actually moved the needle — track sections, prerequisite chips, and a JSON-LD breadcrumb. The backlog had been mis-filing the bottleneck for months.

Read post